Back to category: Technology Limited version - please login or register to view the entire paper. Testing satellite receiver ABA-1010 DSS SATELLITE RECEIVER BOARD Compatibility Test Plan Preliminary September 1997 Prepared By Compatibility Test Lab This page intentionally left blank Table Of Contents Introduction Scope Objectives Product Features Schedule Facts & Policies Reference Documents Test Methodology Compatibility Testing Test Deliverables Test Status Memo Problem Reporting Test Summary Report Pass / Fail Criteria Risks Systems & Peripherals To Be Tested System to be tested Peripheral Devices to be Tested SCSI Hard Disk Drives SCSI CD-ROM Drives SCSI Tape Drives SCSI MO & Removable Drives SCSI Host Adapters to be Tested RAID Adapters to be Tested BridgeRAID Adapters to be Tested Operating Systems to be tested ... Posted by: Amy Hetzel Limited version - please login or register to view the entire paper. |
|
© 2006 TermPaperAccess.com |