Back to category: Technology

Limited version - please login or register to view the entire paper.

Testing satellite receiver

ABA-1010
DSS SATELLITE RECEIVER BOARD
Compatibility Test Plan





Preliminary

September 1997



Prepared By

Compatibility Test Lab



























This page intentionally left blank



























Table Of Contents


Introduction
Scope
Objectives
Product Features
Schedule
Facts & Policies
Reference Documents
Test Methodology
Compatibility Testing
Test Deliverables
Test Status Memo
Problem Reporting
Test Summary Report
Pass / Fail Criteria
Risks
Systems & Peripherals To Be Tested
System to be tested
Peripheral Devices to be Tested
SCSI Hard Disk Drives
SCSI CD-ROM Drives
SCSI Tape Drives
SCSI MO & Removable Drives
SCSI Host Adapters to be Tested
RAID Adapters to be Tested
BridgeRAID Adapters to be Tested
Operating Systems to be tested ...

Posted by: Amy Hetzel

Limited version - please login or register to view the entire paper.