Back to category: Acceptance Limited version - please login or register to view the entire paper. Progress Report Progress Report Description of the Case Study The lots surrounding the historical building located at 595 E. Colorado Boulevard in the City of Pasadena has been approved for development. During this architectural project most of the buildings except for those declared historical will be demolished. In their place a trio mixed-use development will be built (City of Pasadena). This will include 13,500 square feet of ground floor retail and 304 residential units in four new buildings according to the City of Pasadena. In addition to the retail and residential development, there will be a subterranean parking structure built that will accommodate 1,350 vehicles. ... Posted by: Alexander Bartfield Limited version - please login or register to view the entire paper. |
|
© 2006 TermPaperAccess.com |