Operating Procedure

1.0 PURPOSE

To establish and maintain documented procedures for indegenisation of the components.

2.0 SCOPE

The scope of the procedure covers feasibility study on components, selection of vendors, capacity study on vendors, rate negotiation and finalisation, approval for the indegenised components.

3.0 RESPONSIBILITY

It is the responsibility of the commercial group head to ensure that the procedures laid down herein are implemented and followed.

4.0 PROCEDURE:

4.1 Feasibility Study on the Component:

4.1.1 Drawing and Specifications for the component has to be collected from the Engineering Department

4.1.2 Study has to made for each component and the corresponding details has to be filled in the FRM/VD/01 as follows.

a) Part Name & Part Number of the item to be localized should be entered.

b) Monthly requirement of the item is calculated as,
Sum of (APL quantity of the selected part no. in each wiring harness x ...